Potter Road Southeast Loop Extension

Start date:

2017

completion date:

2019

client:

Genesee County Drain Commissioner & Waste Water

CONTRACT PRICE:

$8.5 Million

Installed approximately 39,072 linear feet of owner-furnished 42-inch steel water main using open cut methods and 700 linear feet via tunneling. The project included connections to existing water mains at seven locations, installation of two 30-inch valves with structures, six 36-inch valves with structures, air release valves, blow-offs, and flow meters. Additionally, it involved 70,000 square yards of pavement removal and replacement, and 5,300 square yards of wetland restoration. New box culverts for the county drain system were installed, ranging in size from 3'x4' to 24'x10'.